Basic Info.
Product Description
Product Description
Dredging Pipe Floats Filled With PU Inside - Closed-Cell Polyurethane Foam are made from high wear resistance PE by rotational molding technology. One complete dredging pipe float consists of two halves filled with PU foam which are connected by galvanized bolts, nuts and washers. The reasonable structure makes the dredging floats perform well in tough condition.
Specification of Dredging Pipe Floats Filled With PU Inside - Closed-Cell Polyurethane Foam
Material: Virgin PE shell with PU foam inside. (emtpy floats withou PU foam also available.)
Color: Orange, yellow, customized colors
Inner Diameter: 60-1200mm (±5mm)
Outer Diameter: 300-2200mm (±10mm)
Length: 580-2500mm (±10mm)
Wall Thickness: 10mm±1
Buoyancy: Approx. 26-6150kgs.
If you want a smaller buoyancy, xincheng can design a specific dimension to meet your requirements.
The diameter of this floats can be adjusted from 60mm to 1200mm to fit different sizes of pipes.
1. Compact and reasonable structure
2. In Bright Colors
3. High wear & impact resistance, strong resistance to enviromental stress cracking, strong corrosion resistance and weather resistance.
4. Light weight, low transportation cost, easy for installation
5. Long service life
6. Enviromental friendly
Xincheng Services:
Designing and manufacturing of customized dredging pipefloat;
Repair package for free if any damage occurs;
Third party inspection accepted;
OEM / ODM accepted.
If floats shipped by LCL, xincheng will wrap the floats with film and loading in pallet.
Container and truckage loading & Delivery Pictures
Xincheng manufactures pipe floats for pipes from 110mm to 1200mm, the standard sizes of floats are as following table.
Inner Diameter / mm | Outer Diameter / mm | Length / mm | Wall Thickness / mm | Volume /m³ | Net. Buoyancy / kg |
110 | 300 | 580 | 5.5±1 | 0.032 | 26 |
150 | 450 | 900 | 5.5±1 | 0.1 | 84 |
225 | 500 | 800 | 5.5±1 | 0.102 | 85 |
225 | 700 | 600 | 5.5±1 | 0.142 | 124 |
230 | 725 | 610 | 5.5±1 | 0.19 | 169 |
250 | 700 | 900 | 6±1 | 0.275 | 243 |
280 | 700 | 1200 | 6±1 | 0.34 | 292 |
315 | 850 | 1100 | 6±1 | 0.45 | 405 |
320 | 900 | 1530 | 6±1 | 0.752 | 683 |
355 | 1000 | 10000 | 6±1 | 0.58 | 524 |
355 | 1100 | 1100 | 6±1 | 0.76 | 589 |
400 | 1100 | 1200 | 6±1 | 0.83 | 754 |
436 | 1200 | 1200 | 6±1 | 0.92 | 838 |
450 | 1300 | 1300 | 6±1 | 1.17 | 1069 |
480 | 1300 | 1400 | 7±1 | 1.27 | 1150 |
500 | 1400 | 1400 | 7±1 | 1.56 | 1423 |
500 | 1400 | 1500 | 7±1 | 1.6 | 1476 |
560 | 1400 | 1500 | 7±1 | 1.55 | 1300 |
580 | 1400 | 1600 | 7±1 | 1.72 | 1570 |
600 | 1400 | 1700 | 7.2±1 | 1.78 | 1625 |
630 | 1500 | 1800 | 8.5±1 | 2.2 | 1980 |
670 | 1500 | 1800 | 8.5±1 | 2.18 | 1900 |
710 | 1500 | 1800 | 8.5±1 | 2.1 | 1860 |
730 | 1600 | 2000 | 9±1 | 2.69 | 2437 |
850 | 1800 | 2200 | 10±1 | 3.5 | 3264 |
940 | 2200 | 2500 | 10±1 | 6.67 | 6147 |
1066 | 2300 | 2500 | 10±1 | 6.7 | 6100 |
1200 | 2300 | 2500 | 11±1 | 6.7 | 5800 |
Installation:
The installation of the Dredging Floats for Dredging HDPE Pipelines should be used by the plate, bolts and straps are provided from manufacturer. It should be appropriate to loose lead to plastic is not distortion. it should be equipped with double nuts. In installation, we should avoid sharp objects stabbed Dredging Floats for Dredging HDPE Pipelines.
FAQ
Q. What is your minimum order quantity, can you send me samples?
A. Our minimum quantity is 1 set, and samples are available.
Q: Where is your factory located?
A: Our factory is near XUZHOU Airport and Zaozhuang high-speed railway station , we can pick you up there